Fuel Pumps Upgrade:
-
- Phase One:
- Disconnection and replacement of pumps 1/2 and 7/8 with TOKHEIM Q510 models.
- Phase Two:
- Addressed pumps 3/4, 5/6, 9/10, and 11/12, upgrading to TOKHEIM Q510 models for 3/4 and 5/6.
- Phase Three:
- Focused on HGV pumps 13/14, 19/20, 21/22, 15/16, 17/18, and 23/24, upgrading to TOKHEIM QFS models.
- Phase One:
Data Cabling Installation:
-
- Laid out CAT 5 data cabling from pumps 1/2, 3/4, and 5/6 to the kiosk for enhanced data management.
Safety Enhancements:
-
- Installed seven leak alarms within a GRP cabinet for increased safety.
- Implemented metal-clad switch fuse spurs.
Cabling and Power Infrastructure:
-
- Cables were run through ducts, connecting to the Distribution board with clear labelling at both ends.
- CAT 5 data cables were integrated with the Tank Inventory System (Veeder Root) for efficient monitoring.